Apr 10 2018

In November 2017 South Western Railway (SWR) opened a public consultation for feedback on their proposed timetable changes from December 2018. 

The proposed changes meant that there will be an increase to the number of trains between Waterloo and Reading, and a change to the Waterloo to Weybridge train that will result in it being split into two.

SWR have now published the results of their consultation, details of which can be found on their website.